An example of a draft design for a living booth.

About home economics

Golovna

The life of the smallest little person begins with design.

Preparations for the paper project allow you to plan the area of ​​the room, the number of rooms, windows and doors, as well as to ensure the quality of the work and the number of necessary materials.

When you get ready to have a booth, you can contact specialized companies for help to complete a project, choose one from among those ready, or independently develop a plan for a new life.

It is more rational to create the booth project with a power hand if all everyday work is planned to be completed without outside help.

First stage - planning

The first stage of development of the project includes the outdoor layout of the future cabin, its dimensions, significance, the presence of a garage and other additional materials, as well as the geographical features of the plot, the presence and availability of a sewerage system and a water post Channya.

Another stage – sketches

At the next stage, all the washrooms and baths are washed and assembled into a model booth with a large number of surfaces and rooms.

The draft design has the character of a drawing and depicts the future from different sides: the front, the side, the back and in section (crosswise and laterally).

The selection of materials that are to be painted is also determined, as well as the design features of the booth: type of covering, thickness of walls and ceilings.

Before you publish your new design for the booth, it is important to take photos of the finished plans to get ideas and evidence.

Third stage - working plan

The constructive type of the project conveys a detailed view of the skin element of the hut from the foundation, the wall and the crevices to the smoke, drains and blood.

For example, it is necessary to decipher the characteristics of the windows, which indicate the width of the profile, the type of lining, the number of glazing balls, and the appearance of the sub-window.

Engineering and technical design is directed to the development of a detailed plan and works with the improvement of sewerage, water supply, ventilation, scorching, electrical wiring, grounding and security systems.

Design project to make final adjustments to the building.

At this stage, the color scheme of the façade, walls, roofing and interior furnishings of the space remains visible.

Project booth made from timber

  • Most often, economical, durable and durable wood is chosen as the main material for furniture.
  • However, the project of a private log cabin draws inspiration from the minds of many people:
  • If the required beams are longer than 6 m, then additional insulation of the deck sticks will be required;
  • The sticks are placed in checker order;
  • The number of kuti may be guys;

Particular respect must be given to the competent division of vantage;

The partitions formed from the decks are placed only above the load-bearing walls or on additional pillars.

Target booth project

The project of a booth must necessarily include an assessment of financial feasibility, since this type will become more expensive and necessary to create a concrete and concrete foundation.

Increase your respect!

In case of permanent construction, other features of the material are used: vicorized clay lining on the lower surfaces, double waterproofing in the bathroom, reinforcement of the wall for greater Of this importance, it is necessary to improve the horizontality of the masonry, laying out the windows and door openings from the quarter.

Project from the terrace

Correctly and competently, the arrival to the budinku terrace will also require a special project.

When it is folded, it is necessary to handle its attachments, loosening, level of openness, shape and appearance of joints.

Most often, the terrace is placed next to the walls of the cabin or surrounds the entire structure, or is installed next to the living cabin or adjoins the pool.

Guidelines and references will be the placement of ready-made standard projects on the Internet, adding and expanding how you can create an ideal plan for a new future.

Target booth project

Photo of a do-it-yourself house project

Target booth project

Here I will tell you how to work on one of our projects, the project is an example of how to work on a draft project, and you can improve the process in the middle.

From a technical point of view, most often the work is done on Skype - there you can show each other a chair or a model of a booth, and exchange thoughts.

The work is divided into three stages:

1. decision on the master plan of the plot,
2. planning a booth,
3. Decisions from the outside world.

Where to place a booth, where to start "> where to place a booth, where to start

Let's start from the plot: remove the booth and what its shape may be;

What will be visible from the window of the booth, as their edges are oriented towards the light.

general plan, nuances

Those that were developed at this first stage may change after the results of geological surveys are cleared.
Most often, the soils allow you to build a booth at the intended location, but sometimes there are surprises (swampiness, turf, extremely unsafe flow), and then we have to endure and change decisions .

Nuances may arise from engineering decisions.

If geology shows the presence of soils with sufficient filtering capacity, then the septic tank will have to be replaced with a primary sink well, instead of which it will have to be pumped out periodically.
If the soils become flooded, then in this case the replacement of the septic tank will require a humidifier and maximum sealing.
And the possibility of ventilating the basement in this case will be accompanied by expensive waterproofing.

As it was said above, instantly, according to the general plan, the plot is divided into parts and the PCS (we remember that the planned layout of the cabin is important).
And it is even more important to correctly place engineering measures in the field, which will ensure that there will be a lot of both measure and benefit.
It is recommended to follow the routes between each other and one at a time (at a distance of 1 to 5 meters), so that with these foods it is better to circulate directly.

So, let’s finish with the detailed general plan of the plot and all its subdivisions.

Having completed the work on the general plan, you can work on a detailed plan of the cabin (based on the accepted PPP), and the axis appears as the first version, which we view simultaneously with the client on Skype, ...
... and then a friend, flatter.
At the same time, we are selecting a design, and we
a scheme with load-bearing walls and precast reinforced concrete slabs was designed.

Therefore, they will stand between the walls and dance under the singing panels.
Third, fourth, ... and now fifth version.
The ventilation system has appeared.
canals, sewer risers and water supply.

Engineering systems do not necessarily provide optimal solutions; there are also options.
note: transformation 1 is shown on top, otherwise the work itself is carried out on the 2nd Now the planning suits me and suits the client, and the time has come to shape the “body” - still in a simpler appearance, without windows and wall materials. Tse t.z. forgiven 3D model were




On the administration page
photorealistic

, it does not show the color and texture of the walls, but at this stage it is not necessary.

It is important to pay attention to the shape of the “body” – and select the “makeup” for a new one every year.

The model makes it possible to create booths from different angles.
At which stage the robot ceases to be associated with the client, you can add more options.

Now we can open the window.

I added a little bit of façade decor around them.

Well, ok, I'm ready.

The planning and external appearance are complete.

The very plastic form of the facades on the side of the building, together with the landscape of the plot, can create the image of an everyday, but still “country” little house, a small house in an ethnic style - such a kind of Ukrainian Provence.

The most obvious color is the material of the walls, the coverings may not be glamorous, but have an “ethnic” character. Better for everything, the plaster of the walls was white. Pozhlyvo, clay “aged” tiles on the stove.
The wooden elements of the structure are made from dark, also “time-worn” wood.

Ale... you won’t be like that.

At this very moment, the stylistic concept of the house changed.
The deputy officials cheered “




Budinki Prairie


”(F. L. Wright), and the posture of this style of booths is not to be misunderstood.




And we begin the work with the form from scratch, collecting all those that subdivide the project in the Budinka Prairie style, and adding to their characteristic features.





The free form of the façades in the new version was straightened (and relaxed), the roofing became innovative and “modern” - its hangings extend far beyond the walls, covering the window from the midday sun from the other window on top.

A new, different version of the solution may be more reminiscent of the ever-current organic architecture and robots of F. L. Wright. Plans, like form, have also become simpler. And there have been evolutionary paths from the exit cell to the flat street façade, with the selection of impersonal variations in the planning of surfaces.

The last change - the placement of the furnace on the first surface - stuck out on the front, and created a part on the façade that protrudes. Plans, like form, have also become simpler. Trellis were added to the facades (wooden slats to serve as a vertical basis for the curly shoots).

The axis looks like this in its residual appearance: Plans, like form, have also become simpler. Investigators carefully study and analyze all possible options for the discovery of the virus or other parts.

This allows you to clearly identify all the features that appear before the design of the finished product, as well as ensure the identification of all the features that appear before it. A new set of documents, from which a draft project is formed, is compiled in a separate form to the maximum extent possible. ESKD

design documentation, as well as design documents, diagrams, technical and technological regulations, etc., which are transferred to the protocol for review of technical proposals and technical specifications. Slide indicate what you have draft project

Do not include documents that were divided even before the material layout was prepared.

The procedures for review, time and confirmation do not require the original documents of the draft project, but their copies, although for special housekeeping from the property manager, they can still be given.

Until such an important point, the form in which all documentation of the draft project is presented, it can be paper or electronic, and is indicated in the protocol for reviewing the technical specifications.

If such an entry is made on a daily basis, it is indicated on the basis of the depository. In addition, before the documentation package for the draft project, electronic and paper documents can be included at the same time.

Warehouse for draft design

  • Draft project
  • , includes documents such as a formal design, a statement of the draft design and an explanatory note.
  • The project of a chair of a different type (or an electronic model of a folding unit, which is considered equivalent to the same thing), must include the following:
  • Images of the virus, as well as various writings and text parts, allow us to understand the principle of its work, how its parts interact, as well as the peculiarities of its constructive structure.
  • The designation of all warehouse parts is determined by the same name.

If necessary, it is also necessary to indicate instructions on the chairs of the original type, which will allow you to understand all the important features of the design of the device, the storage of other components, etc. Size the selection and other data that will be applied to the images. The scheme will be tested (in these cases, if it is really necessary).

Technical data and other important characteristics caused by the mother virus. The stinks are needed so that behind the chairs of the dark room it is easier to present different options.» You can place an insert on the option that corresponds to your specific document.

It is also allowed to include documents equivalent to the submission before the draft draft, as well as other forms of submission. In which case it is necessary to work with the corresponding icon in the column “».

Notes